Affiliate notice

Affiliate links may be included in posts for which compensation may be received.
Showing posts with label maritime. Show all posts
Showing posts with label maritime. Show all posts

Thursday, July 18, 2024

Vineyard Wind Turbine Blade Failure

In July, news of an incident in the Vineyard Wind offshore development project off Nantucket Island surprised residents, mariners, and offshore wind stakeholders. 

On Monday, July 15, 2024, Vineyard Wind, a joint venture between Avangrid and Copenhagen Infrastructure Partners, issued an initial statement regarding an incident involving blade damage on a wind turbine in its offshore energy area

"On Saturday evening, Vineyard Wind experienced blade damage on a wind turbine in its offshore development area. No personnel or third parties were in the vicinity of the turbine at the time, and all employees of Vineyard Wind and its contractors are safe and secure. As part of its permitting, Vineyard Wind has detailed plans to guide its response to incidents such as this. Following those protocols, Vineyard Wind established a safety perimeter, and worked with the U.S. Coast Guard to issue notice to mariners. GE, as the project’s turbine and blade manufacturer and installation contractor, will now be conducting the analysis into the root cause of the incident. As that analysis takes place, Vineyard Wind will continue working with federal, state, tribal, and local stakeholders to ensure the health and safety of its workforce, mariners, and the environment."

On July 17, representatives from Vineyard Wind and General Electric, the turbine manufacturer, attended the Town and County of Nantucket Select Board meeting to provide an update on the recent turbine blade failure and the ongoing debris recovery efforts.

The meeting, held in the Community Room at 4 Fairgrounds Road, also allowed for virtual participation. Over 60 people attended the meeting in person, 170 participated online, and over 1600 people tuned in to watch online.

During the meeting, members of the GE and Vineyard Wind teams responded to questions from the Select Board and the public for over three hours.

Jen Cullen, Vineyard Wind's Senior Manager of Labor Relations & Workforce Development, provided an update during the final minutes of the Select Board meeting. She reported that the integrity of the GE Vernova blade had been compromised, with an increased possibility of it detaching from the turbine.

She also reiterated that a 500-meter safety zone around the turbine has been maintained since Saturday night, with constant monitoring. Cullen further explained that Vineyard Wind has mobilized a response team and observed new debris entering the water. The company is notifying various authorities and communities, including the US Coast Guard, federal and state agencies, and local and tribal partners.


On July 17, the Bureau of Safety and Environmental Enforcement (BSEE) issued a statement regarding an incident involving blade damage on a Vineyard Wind offshore turbine:

“Following the July 13, 2024, blade failure incident at Vineyard Wind, BSEE has issued a Suspension Order to Vineyard Wind to cease power production from all its wind turbine generators until it can be determined whether the blade failure affects any other VW turbines. The Suspension Order suspends power production on the lease area and suspends installation of new wind turbine generator construction: Those operations will remain shut down until the suspension is lifted. BSEE has also issued a Preservation Order to safeguard any evidence that may be relevant to determining the cause of the incident.

As of this date, there are no reported injuries or harm to any marine resources or mammals from the incident. BSEE is onsite with Vineyard Wind as investigations are underway. BSEE will conduct an independent assessment to ensure the safety of future offshore renewable energy operations.”


On July 18, Vineyard Wind, issued an update with information about the remaining turbine blade:

"This morning, a significant part of the remaining GE Vernova blade detached from the turbine. Maritime crews were onsite overnight preparing to respond to this development, though current weather conditions create a difficult working environment. Despite these challenging weather conditions, a fleet of vessels remains at sea managing the situation and working to remove bulk debris. We have deployed additional crews to Nantucket Island in anticipation that more debris could wash ashore tonight and tomorrow as we continue to monitor additional coastal communities.

We are staying apprised of GE Vernova’s efforts to manage the situation, including the removal and recovery of the remaining blade attached to the turbine. With public officials, we will continue to keep the islands informed of developments as we work closely with state, federal, local, and tribal partners to respond to this evolving situation, with the safety of our personnel, the public, and the environment as our highest priority.

If debris is found by members of the public, property owners, or local officials, they are advised to immediately contact our reporting hotline: 833-609-5768. Reports of debris can also be sent directly to the cleanup contractor at this link: Recon Survey (NRCC) (arcgis.com)."


The Vineyard Wind project was one of two commercial scale offshore wind projects in U.S. federal waters that were approved in 2021.

According to the Bureau of Ocean Energy Management (BOEM) ,the 800-megawatt Vineyard Wind 1 Offshore Wind Energy Project is located approximately 12 nautical miles offshore Martha's Vineyard and 12 nautical miles offshore Nantucket.

sources: Town and County of Nantucket, Vineyard Wind


Related Information

Town and County of Nantucket

USCG Guidance on Navigational Safety In and Around Offshore Renewable Energy Installations

Coastal Communities Issues



Wednesday, December 13, 2023

NOAA Marine Operations Center - Naval Station Newport Rhode Island

NOAA research vessel NANCY FOSTER
NOAA Ship NANCY FOSTER | credit: NOAA
The Newport Rhode Island waterfront will become the home of another important U.S. government maritime facility.

In December 2023, the U.S. Navy, on behalf of NOAA, awarded $146,778,932 to Skanska USA, from New York, to design and build a new NOAA facility on Naval Station Newport in Rhode Island.

This facility will eventually be the new home of NOAA’s Marine Operations Center - Atlantic. 

While the details of the facility’s design are still being finalized, requirements include having a pier that will accommodate four large vessels, a floating dock for smaller vessels, space for vessel repairs and parking and a building to be used for shoreside support and as a warehouse. Construction is anticipated to be completed by 2027. 

The contract to design and build the new NOAA facility was awarded following a request for proposals that was open from January to August 2023. 

The design and construction of the facility is funded in part by the Inflation Reduction Act. Funding supports community efforts to prepare, adapt and build resilience to weather and climate events.

The act also supports improvements to weather and climate data and services, and NOAA’s fleet of research airplanes and ships. 

“By co-locating with Naval Station Newport, we are able to make our ship operations more efficient and increase long-term cost savings through sharing common capabilities,” said NOAA Corps Rear Admiral Nancy Hann, director of NOAA Marine and Aviation Operations and the NOAA Commissioned Officer Corps.

NOAA’s fleet of 15 research and survey ships are operated, managed and maintained by NOAA Marine and Aviation Operations. The fleet supports a wide range of marine activities, including fisheries surveys, nautical charting and ocean and climate studies.

Two of NOAA's most important research vessels are based out of Newport, Rhode Island:

NOAA Ship Henry B. Bigelow is a fisheries survey vessel built specifically for NOAA to support the study and monitoring of marine fisheries and marine mammals. Henry B. Bigelow operates along the northeast and mid-Atlantic coast, from Maine to North Carolina.

NOAA Ship Okeanos Explorer is dedicated to exploring the open ocean for the purpose of discovery and the advancement of knowledge about the ocean. Missions of the 224-foot vessel include mapping, site characterization, reconnaissance, advancing technology, education, and outreach.

source: NOAA

Related Information

Rhode Island


Friday, August 28, 2020

Maine Sea Grant Working Waterfront and Coastal Communities Promotion

portland head lighthouse maine usa

Maine Sea Grant recently announced a competition to generate great ideas in support of Maine's working waterfront and coastal communities. Awards are available of up to $15,000.

Buoy Maine will focus on strengthening coastal/marine seafood and tourism related industries, highlighting the Maine Brand and experience, building resiliency, and helping Maine's coastal businesses survive the COVID-19 pandemic. Partnerships are encouraged.

Any business or non-profit connected to the Maine seafood or tourism industries or the heritage of its fishing communities are eligible to apply.

The competition will consist of three phases:


Participants will pitch their ideas via the Buoy Maine Virtual Pitch Competition by September 14, 2020.

Applicants that advance to the Pitch at the Buoy Maine Pitch Competition in October will share their idea in a 5-minute pitch. A judges panel will evaluate pitches, and awardees will receive up to $15,000 to further develop their innovation over the next 6 months. Pitches that receive awards will be made public after the Pitch event.

At the Share at the Buoy Maine Finale, selected awardees will share the product or project at a virtual public celebration, including lessons learned, successes, challenges, and how their ideas may support others. The finale will also be a networking event with investors.

For more information, visit https://seagrant.umaine.edu/funding-opportunities/buoy-maine/

source: Maine Department of Marine Resources

Saturday, January 11, 2020

Rhode Island Offshore Renewable Energy Impacts Symposium

17th Ronald C. Baird Sea Grant Science Symposium
April 24, 2020
University of Rhode Island
Narragansett Bay Campus
215 South Ferry Road
Narragansett, RI 02882
uri.edu/gso

benthic saltwater fish - black sea bass
The University of Rhode Island Graduate School of Oceanography, Rhode Island Sea Grant, the Coastal Resources Center, and the International Council for the Exploration of the Sea (ICES) Working Group on Marine Benthal Renewable Energy Developments (WGMBRED) are organizing an opportunity to share lessons learned from Europe regarding the interactions of offshore renewable energy with the environment.

ICES WGMBRED is an internationally recognized group of scientists working at the cutting edge of ecosystem-based science associated with offshore and marine renewable energy installation and environmental interactions.

Event presentations and discussions will focus on key issues identified by Rhode Islanders regarding the potential cause-effect relationships resulting from the construction and operation of offshore renewable energy installations and recommendations for minimizing impacts and promoting opportunities for positive biological outcomes.

This event is organized at the request of Rhode Island resource users, communities, and other stakeholders to inform future decisions.

For more information and to register for the symposium, visit:

https://seagrant.gso.uri.edu/special-programs/baird/

For more on URI’s expertise and involvement in the appropriate development of offshore renewable energy, visit:

https://web.uri.edu/offshore-renewable-energy/.

source: Rhode Island Sea Grant

Monday, December 23, 2019

Maritime Shows In New England 2020

Boston MA | credit: USCG
A number of shows, expos, and other events in New England will spotlight maritime issues such as fishing, seafood, boating, equipment, education, and much more. This post lists a few events that will be held in and around New England in 2020.

Rhode Island Boat Show
January 3 - 5, 2020
Rhode Island Convention Center
One Sabin Street
Providence, Rhode Island 02903
www.riboatshow.com

The RI Boat Show features all types of watercraft. Many dealers and exhibitors offer boat show specials and Rhode Island does not tax boat sales.

2020 Progressive Insurance New England Boat Show
February 8 through February 16, 2020
Boston Convention & Exhibition Center
415 Summer Street
Boston, MA 02210
www.newenglandboatshow.com

Now in its 65th year, the 2020 Progressive Insurance New England Boat Show will be held at the Boston Convention and Exhibition Center, February 8-16, 2020. The New England Boat Show showcases more than 700 boats and watercraft, along with electronics, and other marine accessories.

45th Maine Fishermen’s Forum
March 5-7, 2020
Rockport, Maine
mainefishermensforum.org

The 45th Maine Fishermen’s Forum will be held March 5th, 6th, and 7th, 2020 in Rockport, Maine. The Fishermen’s Forum hosts fishermen, gear suppliers, scientists, government, and other stakeholders. Each year the Forum provides three days of free seminars for fishermen covering a wide range of topics.

Offshore Wind Seminar
The public is invited to attend a one-day seminar on offshore wind energy development in the Gulf of Maine. The seminar will be held on Thursday March 5 from 10:00-4:00 at the Maine Fishermen’s Forum.

For more information, visit www.mainefishermensforum.org

Seafood Expo North America/Seafood Processing North America
March 15-17, 2020
Boston, USA
www.seafoodexpo.com

In Boston, buyers and suppliers from around the world will meet, network and do business at Seafood Expo North America/Seafood Processing North America.

The exposition is sponsored by the National Fisheries Institute. Seafood Expo North America/Seafood Processing North America is North America’s largest seafood exposition.

For more information, visit: www.seafoodexpo.com/north-america source: www.seafoodexpo.com

Please add a comment to suggest additional maritime events in 2020.